Broadway Resurfacing Begins Today

Passing along this flyer about the Broadway / Richmond / Macedonia Rd project which kicked off TODAY (April 1st).

The first phase of construction will be between Richmond Road and Pettibone Road.

During this first phase, traffic will be maintained in the northbound direction (heading out of Twinsburg toward I-271). Southbound traffic will be detoured via eastbound Pettibone Road and southbound Richmond Road.

Broadway Ravenna Resurfacing 4.1.2025

Download this as a PDF